Finish Seismic Upgrades

Seismic upgrades to the tunnel remain unfinished and are no justification to building a $3.5B bridge

In 2007, the Massey Tunnel underwent some seismic upgrades, but work was stopped before reinforcements to surrounding soils could be completed.

The deadline for public input on the Massey Tunnel Replacement Project is coming up fast

The scoping phase of the Environmental Assessment ends on February 15

The BC Environmental Assessment Office (EAO) has invited the public to voice their concerns about plans to replace the Massey Tunnel with a bridge over the Fraser River. The EAO will use your input to determine what issues should be addressed in the environmental assessment for this project.

This is an important opportunity to raise key issues about this project, including:

  • Does the tunnel really need to be replaced? What are the other options?
  • Who should pay for this new bridge?  Industrial users of the Fraser River? The Port Authority?  BC taxpayers?
  • What impact will a new bridge have on traffic and urban development?
  • What impact will a new bridge have on fossil fuel exports on the Fraser River?

You can learn more about these key issues below or at the links above. When you use the form at right to send your comments to the BC government, we’ll copy your concerns to elected representatives at the local, provincial and federal level to keep them aware of the importance of this issue.

Remove, Replace or Retrofit the Massey Tunnel?

The Netherlands are retrofitting a similar tunnel to modern standards.

The George Massey Tunnel was modeled on the Maastunnel in the Netherlands which was built 20 years earlier. Instead of replacing their tunnel with a bridge, the government of the Netherlands is currently upgrading their tunnel at a cost of $262 million Euros – about $420 million Canadian dollars.  In comparison, a new bridge over the Fraser River is expected to cost at least $3.5 Billion dollars.

Is a new bridge over the Fraser River the best place to spend our limited public infrastructure dollars?  Can we upgrade the Massey Tunnel instead and spend the money saved on other projects, like public transit?

Who Should Pay For A New Bridge?

Building a new bridge benefits the Port and fossil fuel exporters.

The pressure to allow bigger ocean going vessels onto the Lower Fraser River has been growing for years, and container truck traffic to and from Deltaport will only increase in the future if Roberts Bank Terminal Two is built.  Right now the Massey Tunnel keeps deeper draft (and heavily loaded) vessels off the river and limits how many trucks can travel to and from the Port through our communities.

The BC government says that the the bridge is being built to benefit commuters, but the Port and industrial users of the Fraser River are clearly going to benefit if this project goes ahead.  They should have to pay for a big portion of the cost of this bridge.  Here are some ideas on how that could happen:

  1.  If cars have to pay a toll to go over the bridge, deep draft ocean going vessels should have to pay a significant toll each time they go under it.  After all, they will benefit from the deeper draft in the river once the tunnel is removed.
  2. Every container that passes over the bridge going to or from DeltaPort should be charged a transportation improvement fee.  Vancouver International Airport collects improvement fees for new infrastructure, and the Vancouver Fraser Port Authority has done the same for Gateway Infrastructure.  The Port should collect a fee for container traffic use of the new bridge and hand it over to the province.
  3. Every tonne of coal, LNG or jet fuel that passes under the new bridge should be charged a similar transportation improvement fee — collected by the Port, and handed over to the  province.

Taking Out the Tunnel Means More Fossil Fuel Exports on the Fraser

Coal Freighters, Jet Fuel Tankers and LNG Carriers: bad for the river and the climate

By keeping deeper draft vessels off the river, the Massey Tunnel has been a check on industrialization of the Lower Fraser.

Tearing out the tunnel will allow fully loaded coal freighters to travel to and from Fraser Surrey Docks.  It could mean bigger LNG carriers loading at the proposed Wespac-Fortis LNG terminal in Delta.  What other fossil fuel export proposals will come forward once the tunnel is gone?  How much development on the river will be enough?  How will we manage impacts on salmon, killer whales and other sensitive marine life?

Before the province rushes ahead with this proposal, we need to develop a comprehensive vision for the future of of the Lower Fraser that guides development and protects this important ecological lifeline.

What will a new ten lane bridge do to our region?

Moving traffic bottlenecks elsewhere, pressure for residential development and industrial use of farm land to follow.

The existing Massey Tunnel represents a safety valve that keeps growth under control in our region.   Yes, rush hour congestion in the tunnel is a problem that needs to be solved.  But replacing the tunnel with an expensive ten lane bridge will just shift that congestion problem somewhere else — likely to the Oak Street Bridge further north. We need a comprehensive plan for regional transportation.  Instead, the BC government creates obstacles to securing long term regional transit funding and rushes ahead with an expensive bridge replacement project that benefits industrial interests and will likely cause as many problem as it solves.

Removing the tunnel will encourage development — including further residential development south of the Fraser River and additional big box retail development near the Tsawwassen Ferry Terminal.  Eventually, new development will lead to new, higher levels of traffic.  As regional planners have known for some time, we simply can’t build our way out of congestion.

Removing the tunnel will also encourage the industrialization of farmland in Richmond and Delta to serve the Port Authority’s planned expansion of the DeltaPort Container terminal at Roberts Bank.

The short term benefits of a new ten lane bridge are not worth the long term costs of paved-over farmland and urban sprawl that this development will bring to our region.

2016/02/15 23:59:39

The EA scoping comment period is now closed, but you can still use the form below to express concern about  the Massey Tunnel Replacement Project.

(Your response to this question is required by the BC EAO)

Regional
Delta Mayor and Council
Richmond Mayor and Council
New Westminster Mayor and Council
Surrey Mayor and Council
Delta MLAs and MPs
Richmond MLAs and MPs

Provincial
BC Premier Christy Clark
BC Environment Minister Mary Polak
BC NDP Leader John Horgan
BC NDP Environment Critic Spencer Chandra Herbert
BC Green Party MLA for Oak Bay – Gordon Head Andrew Weaver

Federal
Prime Minister of Canada – Justin Trudeau
Leader of the Green Party – Elizabeth May
Leader of the New Democratic Party – Tom Mulcair
Interim Leader of the Conservative Party – Rona Ambrose
Minister of the Environment & Climate Change – Catherine McKenna
Minister of Public Safety & Emergency Preparedness – Ralph Goodale
Minister of Innovation, Science & Economic Development – Navdeep Bains
Minister of Fisheries and Oceans – Hunter Tootoo
Minister of Infrastructure and Communities – Amarjeet Sohi
Minister of Transportation – Marc Garneau

This way we can keep our elected representatives and the proponent up to date on public interest in this project.

(We'd like to inform you of important milestones related to this project.)

After submitting your comments you will receive an email confirming your comments have been copied to government representatives and the project proponents.

We respect your privacy. You will not receive further email from Burns Bog or Real Hearings unless you opted to join our mailing lists.

We will post your concerns on the Public Comments page of this site to create a public record of our concerns. To contact the organizations supporting this campaign, click on their logos below and you will be taken to their web sites.